Sunday, January 16

After the shutdown at Ringhals – Karlshalm’s power plant can start today – News (Ekot)

Listen: elpriser tgm APP

  • The shutdown of one of the Ringhals nuclear power plants means that reserve power may be needed today.

  • Svenska kraftnät has requested that the power producer Uniper be ready to start up the oil-fired reserve unit in Karlshamn with two hours’ notice.

  • Reactor 3 was stopped on Thursday and the forecast is that it can be started at midnight, today Monday, The same reactor was also stopped at the end of December.

Reference-sverigesradio.se

Leave a Reply

Your email address will not be published. Required fields are marked *